What is the difference between direct and indirect costs?

A direct cost is traceable to a specific product or project, such as materials. An indirect cost serves more than one, such as workshop rent, and must be allocated.

Direct and indirect costsIn Arabic: التكاليف المباشرة وغير المباشرة

The term explained

This separation affects how each project's profitability is measured. Counting direct costs alone may show a project as profitable when it does not cover its share of overheads.

In Muhhkam

You track costs with cost centers and projects, and the “Cost centers report” («تقرير مراكز التكلفة») and “Projects report” («تقرير المشاريع») show the result.

Related terms

Ready to take control?
Start today. The trial is free.

14 days on the Comprehensive plan with every feature. Sign up in minutes and issue your first invoice today.